Case study · Monthly progress · Duane Realty Group
264 Commerce Center: A Tilt-Up Warehouse, Month by Month
A 119,850 square foot Class A warehouse, flown for Duane Realty Group every month from a graded lot in May 2025 to the finished building on April 14, 2026, always from the same corner of the site.
- Client
- Duane Realty Group
- Site
- 3910 Produce Road, Louisville, Kentucky
- Building
- 119,850 sq ft Class A warehouse, tilt-up concrete
- Flown
- May 2025 to April 14, 2026
- Each visit
- Photos and 4K video by download link, in their own folders
- Also delivered
- A leasing film for the brokers

The brief
A record a developer can lease from
A developer needs two things from progress flights: proof of where the job stands, and images that can sell the space before it is finished.
Every visit started from the same corner of the site, so any two months line up. The schedule followed the work rather than the calendar: two flights on back-to-back days for the tilt-up on July 22 and 23, 2025, a skipped January when nothing new had happened, and a February visit held until the snow was off the truck courts.
Same corner, eleven months apart
May 2025 to April 2026
A graded lot beside an older warehouse, then the finished building with its paving striped. Drag the handle to compare.



The leasing film
Marketing the space while the walls went up
Halfway through the build, Duane Realty asked for something its brokers could market the building with.
I cut the tilt-up footage together with the finished-building renderings and the leasing details into one film for the brokers, the website and social media.
The building
From the leasing details
- 32 foot clear height
- 16 dock doors plus 2 drive-ins
- 140 foot truck court
- 105 parking spaces, expandable
On your site
A developer schedule on your project
I am based in Louisville and fly job sites across Kentucky and Southern Indiana, and farther when a project calls for it. A site a few hours away is scheduled the same way as one across town: the visit windows are set at the start, and every set arrives by download link, organized by date.
Monthly flights, extra days for the big moments and a film for leasing can all be scoped together, with one clear price.
More case studies
Other builds on a schedule
LRZC for Kelley Construction
Sixteen visits on a 324,576 square foot distribution build.
Medical clinic, Elizabethtown
Monthly photos and video on a clinic build in Hardin County.
Next step
Building to lease?
Send the site and the timeline. You will get a schedule for progress flights and marketing footage, and one clear price, before anything is booked.







