1. Home
  2. Projects
  3. VA medical center

Case study · Monthly mapping · Walsh Construction

A New VA Medical Center, Mapped Every Month

I have flown the new VA medical center in Louisville for Walsh Construction since the site was graded dirt in March 2022, every month since January 2023, and every visit since June 2024 has also produced an orthomosaic map of the whole campus.

Client
Walsh Construction
Site
Brownsboro Road and the Watterson Expressway, Louisville, Kentucky
First flight
March 21, 2022
Schedule
Monthly since January 2023
Maps
A full-site orthomosaic every month since June 2024
Also delivered
Photos, video and a film of the 2023 steel year
Tower crane and multistory hospital wings under construction near a blue water tower
Monthlymap, photos and video

The brief

A current picture of a moving campus

On a hospital campus this size the site changes every week, and a satellite view goes stale fast.

Each monthly visit now produces a map stitched from hundreds of overhead photos, plus the photos and video from the same flight. The project team gets a dated, zoomable picture of the whole site to plan laydown, staging and access on, and to check distances and areas without walking into an active work zone.

The maps are visual planning and documentation tools, not boundary or legal surveys, which must come from a licensed professional land surveyor.

Two years of maps

June 2024 to July 2026

The same campus from directly overhead, two years apart. Drag the handle to compare.

Drone orthomosaic map of the new Louisville VA Medical Center construction site in June 2024
Drone orthomosaic map of the new Louisville VA Medical Center construction site in July 2026
June 2024July 2026
Orthomosaic maps of the VA medical center site for Walsh Construction.

Along the way

Milestones caught from the air

March 21, 2022

The first flight, over a graded site beside the interstate.

November 30, 2023

Topping out: the signed final beam goes up with an American flag.

October 8, 2024

A crawler crane sets the blue water tower tank on its column.

September 20, 2025

A helicopter lifts equipment onto the hospital roof.

On film

The day the water tower went up

Milestone days get their own flights. The water tower lift was filmed from the air from the ground up to the top of the column.

From public project information, the campus is a new medical center of about 910,000 square feet on about 34 acres, with a 1,300-car parking structure and a central utility plant.

On your site

Monthly maps on your project

I am based in Louisville and fly job sites across Kentucky and Southern Indiana, and farther when a project calls for it. A site a few hours away is scheduled the same way as one across town: the visit windows are set at the start, and every set arrives by download link, organized by date.

A map, photos and video can all come from the same visit, under one quote, for as long as the build runs.

More case studies

Other builds on a schedule

LRZC for Kelley Construction

Sixteen visits on a 324,576 square foot distribution build.

Read the case study

264 Commerce Center

A tilt-up warehouse flown every month for Duane Realty Group.

Read the case study

Medical clinic, Elizabethtown

Monthly photos and video on a clinic build in Hardin County.

Read the case study

Next step

Need a current map of your site every month?

Send the site and the schedule. You will get a plan for maps, photos and video, and one clear price, before anything is booked.