- Home
- Projects
Project work
Projects From Above
Construction, infrastructure, industrial and land projects across Kentucky and Southern Indiana. Client names appear only with permission.
Selected work
Recent projects
Monthly mapping, progress video, infrastructure, industrial and land work. Each links to the full story where one is published.

Louisville VA Medical Center
A 40-acre hospital campus flown every month since the summer of 2024. Each flight becomes one measurable orthomosaic of the whole project that superintendents measure on, planners mark up and the owner keeps as a dated record.
Read the case study
Medical clinic, Elizabethtown
The same flight every month from the same positions, from mass grading to a finished building pad five weeks later and on to the building. At the end of the job the footage becomes one highlight film.
Read the case study
Downtown New Albany riverfront
A mixed-use building rising along the Ohio River, documented from the air as it goes up: site development, structure floor by floor and the building in its downtown and riverfront context.
Read the full story
I-264 and U.S. 42 interchange
One of Louisville's largest recent transportation projects, rebuilding the Brownsboro Road interchange into a single-point urban interchange while traffic keeps moving. Aerials track the ramps, roads and bridge work phase by phase.
Read the full story
Quality Stone & Ready Mix quarry
Three hundred acres of limestone benches, stockpiles, conveyors and haul trucks, all working at once. The aerials show the whole operation in relation to itself and the farm country around it.
Read the full story
LRZC, 8001 Air Commerce Drive
Sixteen visits over thirteen months, from a graded pad in June 2025 to the finished building in July 2026. I was there before dawn on July 8, 2025 for the slab pour, in September as the crawler crane stood the tilt-up walls and on September 30 as steel and roof went on, and I kept flying through the December and February snow.
Read the case study
264 Commerce Center, Louisville
A tilt-up distribution building on Produce Road, flown every month for a year from the cleared lot to the finished building. Every visit starts from the same corner, so any two months line up. During the tilt-up in July 2025 I also made a short film for Duane's leasing team.
Read the case study
150 acres near Leitchfield
About 90 acres of fields and farmstead and 60 acres of standing timber, offered together or separately. Boundary overlays on real aerial frames let buyers see both parcels and their road frontage at once.
Read the full story
Mountain Parkway
New lanes cut through the eastern Kentucky hills, flown in autumn to show the scale of the rock cuts and the road winding through the forest.
Featured build
LRZC, thirteen months apart
June 2025 and July 2026 from the same spot across the pond. Drag the handle to watch a 324,576 square foot distribution building go up.


Featured build
264 Commerce Center, a year apart
May 2025 and April 2026 from the same corner. Drag the handle to watch a 119,850 square foot warehouse appear.


On film
Project films

Trusted on projects for
A few of the names

Next step
Want your project on this page next?
Send the site and the schedule you have in mind. One clear price for the whole job, before anything is booked.












